Kaluganga Multipurpose Project26/01/2010 |
|
| Lahmeyer International has been awarded a consultancy services contract for the preparation of tender designs and documents for the Sri Lanka Kaluganga multi-purpose project. The project aims to provide supplementary supplies for irrigation and urban/industrial water requirements. The main components comprise a 65m high rockfill dam and two saddle dams, together with a spillway, two intakes for irrigation canals and a bottom outlet. |
|
The construction supervision is an option. Lahmeyer International has already been involved in this project since 2004. At that time a Feasibility Study for the Kaluganga Multipurpose Project was carried out.
Read more about: Industrial Supplier: Lahmeyer International GmbH UN Agency Funds Irrigation Improvement Projects Smart Grids Crucial for Future Utility Operations UK: Underinvestment in Flood Infrastructure Nearly 10 Million to Clean Up US Beaches California Clean Water Agencies Champion Clean Energy Initiative Green Sewer Collection System Treatment Smart Metering Endpoint Critically Needed Water in Typhoon-hit Philippines World Champion Water Polo Team Joins UN Conservation Effort OGC WaterML 2.0 Comment Sought Comments (0): |

© 2012 Geomares Publishing Copyright reserved.