Kaluganga Multipurpose Project26/01/2010 |
|
| Lahmeyer International has been awarded a consultancy services contract for the preparation of tender designs and documents for the Sri Lanka Kaluganga multi-purpose project. The project aims to provide supplementary supplies for irrigation and urban/industrial water requirements. The main components comprise a 65m high rockfill dam and two saddle dams, together with a spillway, two intakes for irrigation canals and a bottom outlet. |
|
The construction supervision is an option. Lahmeyer International has already been involved in this project since 2004. At that time a Feasibility Study for the Kaluganga Multipurpose Project was carried out.
Read more about: Industrial Supplier: Lahmeyer International GmbH Urban Streams Harmful to Aquatic Life After Pavement Deicing Open Channel UV Wastewater Disinfection Systems Southern Water Asset Management Tomorrow's Water Winner to Compete Internationally UNEP Head Donates Prize Money to Flood Victims Twenty Million Meals for Flood Victims InfoSewer Version 6.0 for ArcGIS 10 Capital Increase to Invest in Hydropower Wastewater Remediation Technology Voltea Raises EUR3.6 Million Additional Financing Comments (0): |

© 2010 Geomares Publishing Copyright reserved.