-advertisements-

COP15 and water...


- advertisements -
Spacer
Governance
Governance > Flooding Dutch Polder Best for Nature

Flooding Dutch Polder Best for Nature

  28/10/2009
The Dutch should give part of the land they drained a century ago back to nature, according to agriculture minister Gerda Verburg on the advice of a special committee. Allowing water to flood farmland is the best way to repair damage done to nature, the committee said.

dutch polder The area under discussion is the Hertogin Hedwige polder in the south-western province of Zeeland. Ed Nijpels, who chaired the advisory committee, said he understands local sensitivities.

 

"I know the proverb 'a person from Zeeland doesn't relinquish land to water' but we can't get around it if we want to restore nature," Nijpels said. Zeeland is largely below sea level and suffered a major flood in 1953 in which 1,835 people died.

 

In 2005, Netherlands and Belgium agreed to deepen the Westerschelde (the estuary connecting the Scheldt river to the North Sea) to restore damage to the local environment and protect the adjoining Antwerp region from flooding. Part of this deal was to give the 300 hectare Hedwige polder back to the sea. The Belgians agreed to pay for the work since development of the Westerschelde estuary is important for Antwerp harbour. However, national and local Dutch politicians objected to the plan and the government set up the advisory committee led by Nijpels to look into alternatives.

 

The committee examined 78 options, but concluded that the most effective solution is to stick with the original plan to return the Hertogin Hedwige polder to the sea. The reason for this is not just because of the original agreement, but "to contribute to nature preservation and meet European nature regulations," said Nijpels. "Flooding this polder is only the beginning. To really restore nature in the Westerschelde, we need to flood another 1,500 to 3,000 hectares."

 

The Hertogin Hedwige polder was reclaimed from the sea in 1907. The owner of the farmland involved has so far been unwilling to cooperate with the plans to allow the sea to take back the area.

 

Source: NLC Handelsblad





Bookmark and Share




     


Comments (0):
There are no comments yet.
Make your comment:
Name:
Your comment:
Type over the 2 words (or number) from the picture
 
Popular news Events Job ads
Spacer
Spacer
Spacer
 

Interactive


Columbia Wastewater Treatment Plant Upgrade

John Dooley, director of utilities and engineering for the City of Columbia (US), talks about a USD40 million project for the city's Metropolitan Wastewater Treatment Plant. The capacity will increase to 150 million gallons/day (now 80 million gallons), and the pumping facility is to be relocated on the property. Requests for quotes are being prepared to be published soon.

 

 Last 5 items:
 Columbia Wastewater Treatment Plant Upgrade
 Hydrogenic City 2020 Project
 Antarctica Challenge: A Global Warning
 Youth Voice on Climate Change
 Drinking Water Analysis with USGS
 
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer