-advertisements-

The Water Footprint is


- advertisements -
Spacer
News
News > DHV Completes Plan for Suez Canal Port

DHV Completes Plan for Suez Canal Port

  19/11/2008
Dutch consultancy and engineering group DHV has completed the master plan for a new port and industrial complex to be developed to the East of Port Said, Egypt. Port Said is located on the East bank of the Suez Canal, through which 30% of the world’s container transport and 13% of the world's trade flows. Dutch research and consultancy firm ECORYS and Nile Consultants of Egypt are partners in the project. Egypt's Prime Minister Ahmed Nazif has presented the plan to interested investors and port-based companies.

 

Port Said Plans of DHV
Thanks to the port’s location on the entrance to the Suez Canal and the large amount of land available for construction, the project is set to play a pivotal role in Egypt’s economic development. ‘This is one of the most promising port projects in the world, as we have the opportunity to start from scratch, so to speak. Usually we are asked to develop solutions for part of a project, but now we can devise a comprehensive plan from the outset,’ says DHV project manager Wim Klomp. The total area to be developed covers some 120 square kilometers, making it comparable in size to the port site at Rotterdam, one of the largest ports in the world.

Because of the port’s ideal location, companies are eager to invest in the area. The master plan includes DHV’s recommendations for developing the port and industrial complex, which has been divided into several industry-specific clusters. ‘Having a presence here is particularly important to international companies with markets in North Africa, Europe and Western Asia,’ says Klomp. ‘The presence of the industrial zone is a major advantage. We are seeing strong interest from companies in the logistics, automotive, petrochemical, textiles and electrical appliances industries.’
Future development
Additional major investments are planned at a later stage, including expansion of the city of Port Said, construction of a tunnel linking the port complex to the city, and an upgrade of the infrastructure linking Port Said to Cairo. ‘Today, Port Said East Port is the site of a highly successful container terminal,’ notes Klomp. ‘In 15 to 20 years’ time, ten additional terminals will be constructed, including oil terminals, Roll-On Roll-Off (RoRo) terminals and multi-purpose terminals. Besides the transshipment of cargo, the port will also be used to transport goods to and from the industrial zone in the future.’

DHV was commissioned by the Port Said Port Authority (PSPA) to draw up the master plan in September 2007.

 

 







Read more about:  Industrial 
Supplier: DHV Group

More news from this supplier:
Siverek Sewerage and Wastewater Treatment
Dutch Experts to Design Flood Safety System
Sewage Treatment with Water Garden
DHV Demonstrations at International Water Week
Vietnamese Drinking Water Supply to be Improved
Partners for Water Projects
Sustainable Wastewater Treatment Plant
Dutch Water Expertise for South Korea
Korea Gets Movable Barrier
2008 Good for DHV Group


Opportunities In Asia’s Fast-Growing Environmental Protection Markets
WaterLink International will Cease to Exist
Water & Wastewater Balancing Act at EWWMC
Portable Water Quality Monitoring System
Toxic Mine Waste Threatens Waters
Drought Happens
Blue Economy to Protect Mediterranean Sea and Oceans
Mine Wastewater Pump Deliveries
Danish Nationwide Sea Level Rise Flooding Tool
Milestone Stormwater Flooding Project Completed


     


Comments (0):
There are no comments yet.
Make your comment:
Name:
Your comment:
Type over the 2 words (or number) from the picture
 
Popular news Events Job ads
Spacer
Spacer
Spacer
 

Interactive


Stuart Orr: Water - the Solvable Crisis

 

In a TEDx WWF session held in Geneva, Switzerland, Stuart Orr talked about water which is a solvable crisis. Stuart Orr is freshwater programme director for WWF International.

 

 Last 5 items:
 Stuart Orr: Water - the Solvable Crisis
 Microbubbles Assisting Treatment Process
 Mangroves Recover from Spill
 Reusing Greywater and Stormwater in California
 TEDx Woods Hole: Ecological Design and Water Reuse
 
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer