-advertisements-

COP15 and water...


- advertisements -
Spacer
Pollution
Pollution > Scottish Water Fined

Scottish Water Fined

  05/09/2008
The water authority pled guilty to failing to comply with a water use licence condition which specified that a continuous flow recorder, with on-site visual display from which readings would be readily obtained, and an associated data storage facility would be provided and maintained. Because of Scottish Water\'s failure to install and maintain the necessary equipment, the matter was reported to the Procurator Fiscal by the Scottish Environment Protection Agency (SEPA).

Fintry waste water treatment works discharges fully treated sewage effluent and, in storm conditions, partially treated sewage effluent to the Endrick Water. In September 2006 Scottish Water was granted a licence by SEPA to increase the flow passing through the upgraded works. In the licence, SEPA included a condition relating to flow recording equipment because the Endrick Water is a Special Area of Conservation. This is primarily due to the populations of brook and river lamprey, but also the presence of Atlantic salmon.

 

The installation of monitoring equipment would enable SEPA to assess how well the works was handling the current flows, and what its future potential would be. Some monitoring equipment was installed; however all the necessary equipment was not provided and properly operating between 1 January 2007 and 22 April 2008. On several occasions SEPA was informed that work was required to reconfigure or replace the equipment.

 

SEPA's Les Watson said that at the moment the discharge from Fintry is not affecting the water quality of the Endrick Water, but the upgraded works allows for a theoretical increase in housing in the village and hence increased flow from the works.

 

 

 





Bookmark and Share

Read more about:  environment 
Supplier: Scottish Environment Protection Agengy (SEPA)

More news from this supplier:
New Targets for Scotland's Water
SEPA in Annual Flood Awareness Campaign
Initiative to Tackle Flood Skills Shortage
New Approach to Water Protection Explained
Improving Health of Waters in the Forth
Improving Future Health of Scotland's Water
Chaorach Hydro Scheme Authorised
East Dunbartonshire Man Fined
Sewage Disposal Fined
Scottish Wave Buoys


Water 2030, Who Cares?
Co-Digestion - Is It Worth The Biogas?
Wastewater Treatment Through Thai Wetlands
Hydropower Opportunities and Challenges
Water Treatment System Expansion
Water Sustainability Forum
Severn Pipe-dreams
Ceramic Water Purifier Testing
Farming Future Floodplains
Iraq Drought Aid


     


Comments (0):
There are no comments yet.
Make your comment:
Name:
Your comment:
Type over the 2 words (or number) from the picture
 
Popular news Events Job ads
Spacer
Spacer
Spacer
 

Interactive


Columbia Wastewater Treatment Plant Upgrade

John Dooley, director of utilities and engineering for the City of Columbia (US), talks about a USD40 million project for the city's Metropolitan Wastewater Treatment Plant. The capacity will increase to 150 million gallons/day (now 80 million gallons), and the pumping facility is to be relocated on the property. Requests for quotes are being prepared to be published soon.

 

 Last 5 items:
 Columbia Wastewater Treatment Plant Upgrade
 Hydrogenic City 2020 Project
 Antarctica Challenge: A Global Warning
 Youth Voice on Climate Change
 Drinking Water Analysis with USGS
 
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer