-advertisements-

The Water Footprint is


- advertisements -
Spacer
Pollution
Pollution > Ten Year Contract Rhode Island

Ten Year Contract Rhode Island

  08/03/2010
Suez Environnement has announced the signing of a 10-year DBO (Design, Build, Operate) contract covering collection and wastewater treatment facilities for the city of East Providence, meeting the needs of around two thirds of its 50,000 residents. United Water now has operational responsibility for the system, as well as ensuring the compliance of the infrastructures and treatment processes with the new standards which Rhode Island State has set for the Environment Management Department, for a total of 38 million euros. In addition, the contract for operating the facilities over 10 years represents EUR33 million euros.

 

Under this agreement, United Water will be in charge of improvements to be made to the
treatment plant, which dates back to 1954, as well as its operations. In addition to work to
renovate the plant, United Water will be in charge of building a new pumping station in
Watchemoket Cove and a wastewater pipe between now and August 2013.

 

The water treatment plant will benefit from major improvements, including odour control
systems and a biological nutrient removal process, making it possible to reduce nitrogen levels in the water that has been treated. This new process will represent an additional treatment phase, paving the way for improvements in water quality in the Pawtucket River and Narragansett Bay.

United Water already runs the Bucklin Point water treatment plant on behalf of the
Narragansett Bay Commission, covering the needs of approximately one third of the people
living in East Providence. The company also operates the Westerly, Newport and Warren water treatment facilities. It has won several awards from the National Association of Clean Water and the National Wastewater Pollution Control Agency for the excellent quality of its services.

 

 





Bookmark and Share

Read more about:  wastewater  compliance  environment 
Supplier: Suez Environnement

More news from this supplier:
National Command Centre After Irene
Solutions for City Water Systems
Innovation Fund for Water and Waste Technologies
Rebuilding Pretreatment Unit Wastewater Treatment Plant
Suez Environnement Awarded WWT Contract
Recovering Wastewater Heat for Aquatic Centre
Water Contracts for Brazil, Panama and Chile
Suez to Build and Operate Drinking Water Treatment Plant
Carbon-Neutral Wastewater Treatment Plant
Suez Environnement Appointments


NASA Mission Takes Stock of Earth's Melting Land Ice
Alleviating Water Problems In Abu Dhabi
Dutch Experts to Design Flood Safety System
2.8 Million Gallons of Water Saved In Seven Months
Oil and Gas Water Reuse Pilot in Alberta
UN Agency Funds Irrigation Improvement Projects
Smart Grids Crucial for Future Utility Operations
UK: Underinvestment in Flood Infrastructure
Nearly 10 Million to Clean Up US Beaches
California Clean Water Agencies Champion Clean Energy Initiative


     


Comments (0):
There are no comments yet.
Make your comment:
Name:
Your comment:
Type over the 2 words (or number) from the picture
 
Popular news Events Job ads
Spacer
Spacer
Spacer
 

Interactive


Stuart Orr: Water - the Solvable Crisis

 

In a TEDx WWF session held in Geneva, Switzerland, Stuart Orr talked about water which is a solvable crisis. Stuart Orr is freshwater programme director for WWF International.

 

 Last 5 items:
 Stuart Orr: Water - the Solvable Crisis
 Microbubbles Assisting Treatment Process
 Mangroves Recover from Spill
 Reusing Greywater and Stormwater in California
 TEDx Woods Hole: Ecological Design and Water Reuse
 
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer